On February 19, 2026, a partial degradation occurred in the CI infrastructure in the us-west1 region due to issues affecting the NAT control plane. During a brief window (~30 minutes), a limited number of CI build jobs failed during VM initialization. The issue was detected through internal monitoring and mitigated via controlled failover, followed by restoration of the affected NAT instances.
The incident was caused by saturation of connection tracking (iptables/conntrack state) on NAT virtual machines in the us-west1 region.
A short-lived spike in build VM activity led to a burst of metadata-related connections. Over time, stale connection entries accumulated without automated cleanup, eventually preventing the NAT VMs from accessing the cloud metadata service.
This metadata connectivity disruption impacted control-plane functionality (including VM provisioning), which resulted in a limited number of build initialization failures.
Customer Impact:
Data Loss: None
Duration: Approximately 30 minutes
Customers were advised to retry failed builds after mitigation.
To prevent such issues from happening again, we will
Deploy automated iptables/conntrack cleanup for metadata traffic.
Improve monitoring for metadata connectivity health.